PRJEDU_oee — OEE of a production line, shift by shift

Every file of this example — the XML, the scripts, the page — is in PRJEDU_oee on GitHub. Run it with run.bat (Windows) or ./run.sh (Linux) from that folder.

A line makes parts. It breaks down now and then, jams, runs slow, waits for material, stops for a changeover between lots, and makes a bad part every so often. All it tells the outside world is seven Modbus registers — running or not, a reason if it knows one, two counters, the product. A small MES (manufacturing execution system) reads them twice a second and turns them into what an industrial engineering course is about: where the time went, and OEE.

run.bat

On Linux: ./run.sh. Then open http://127.0.0.1:8100/.

Document What it is
LINE/S00 the machine, simulated: products A and B in lots, breakdowns, jams, slow spells, missing material, changeovers, bad parts. A Modbus TCP slave on 127.0.0.1:1505
OEE/S00 the MES: a Modbus master that polls the line, the time accounting, OEE, the stop and shift records in SQLite (log\oee.db), and the page

A shift lasts eight minutes here (SHIFT_S), with a 30 s planned break after four — so a lesson sees several shifts. Everything else is real seconds.

OEE in one picture

The page draws it as a waterfall, live for the running shift:

shift time
 - planned break                        = planned production time
 - downtime (breakdowns, changeover,
   waiting, other, not assigned yet)     = run time
 - minor stops, running slow             = ideal time of all parts made
 - bad parts                             = fully productive time

availability  A = run time / planned production time
performance   P = ideal time / run time
quality       Q = good parts / all parts
OEE           = A × P × Q  =  fully productive time / planned production time

The last equality is the check under the four numbers: the MES computes OEE both ways, from different sums. In a shift that made one product they agree to the last digit. In one that made both they drift a little apart (measured: 64.83 % against 64.70 %) — not an error: Q counts parts, while fully productive time weighs each good part by its own ideal cycle, and a bad B part (2.5 s) costs more time than a bad A part (2.0 s). The time formula is the exact one; A × P × Q is the one on the posters.

The six big losses of TPM land here like this:

Loss Where it comes from Counts against
breakdowns the machine's fault codes 10–12; a long jam the operator names availability
setup and adjustment the changeover between lots (reason 30) availability
(waiting, other) material missing, operator away, quality check — the operator says which availability
minor stops any stop shorter than MINOR_S (5 s): jams performance
reduced speed the slow spells — the machine never says so; the parts just come too slowly performance
startup rejects, production rejects bad parts; the first parts after a changeover are bad more often quality

What the MES has to decide

Seven registers are not much. Most of an MES is decisions about them — each one is a few lines in db/db_OEE.js, and each one changes the number:

  • The counters wrap. They are 16-bit: after 65535 comes 0, and they start near the top on purpose. The MES counts the difference since the last poll, modulo 65536. A difference larger than CNT_MAX is taken as a reset at the machine and not counted (a log line says so).
  • The ideal cycle is master data, kept in the MES (PRODUCTS), not something the machine reports. Parts are credited with the ideal time of the product being made when they were counted.
  • A stop shorter than MINOR_S is a minor stop: it stays in run time and shows up as performance loss.
  • The machine does not always know why it stopped. A jam and a missing pallet both say reason 0. A stop that ends up longer than a minor one and has no reason waits for the operator, who picks one on the page — for the stop going on, or for one that is over (a select in the stop list). Only reasons marked by="operator" in the catalogue are offered or taken.
  • The plan decides planned time, not the machine. From BREAK_AT_S for BREAK_S the time is planned, whatever the machine does. The MES holds the line through register 6; if the machine is broken down when the break begins, the breakdown ends at the break, and whatever is left of it after the break is downtime again.
  • A stop whose reason changes is two stops. A breakdown that ends straight into a missing pallet, with no running in between, is booked as a breakdown and then as waiting — not all as the breakdown.
  • A stop cut by the shift change or the break is not a minor stop, however short the piece: it was not over.
  • No answer from the line for POLL_LOST_S is downtime too: reason 99.
  • The part is counted in the shift in which it is counted. A part that was mostly made in the last shift lands in this one — so for the first minute of a shift performance can read over 100 %. It evens out; the page says so.

All of these are XML attributes in db/db_OEE.xml (SHIFT_S, BREAK_AT_S, BREAK_S, MINOR_S, POLL_LOST_S, CNT_MAX, PRODUCTS, REASONS).

The record

log\oee.db (SQLite, nothing to install) keeps every stop and every finished shift:

stop  (sid, shift, start, dur_s, reason, kind, by)    -- kind: down, minor, planned
shift (no, name, start, end, length_s, planned_s, run_s, down_s, minor_s,
       ideal_s, good_ideal_s, total, good, scrap, scrap_su, a, p, q, oee)

The page's history table and the "last 10 shifts" Pareto are queries on it; Download CSV writes the history for a spreadsheet. A restart of the engine begins a new shift — the half-shift in memory is not kept.

Shift report (printable) opens www\report.ayp: one finished shift — the four numbers, the time accounting, downtime by reason and every stop — as plain HTML, ready to print or to mail as a link (report.ayp?no=7). It is a server page: the engine runs the file on each request, reads log\oee.db with the same SQL.* calls the MES uses and names the reasons with the MES's own main.reason_of(). Nothing else in the project changed for it — no connection, no script function, no MQTT topic; the web listener that sends index.html runs report.ayp too. The shift number from the address goes into the query as a bound parameter, never into the SQL text, and report.ayp?no=999 is a 404. How pages work: PRJEDU_pages (engine 4.3.4.588 or later).

What it measured

On a Windows 11 laptop, engine 4.3.4.467, two full eight-minute shifts with the default settings, a script naming one of the unnamed stops ("material missing", after the fact) and leaving the rest unnamed:

shift A #1 shift B #2
planned production time 449 s 449 s
downtime 116.5 s 147.5 s
run time 332.5 s 301.5 s
minor stops (in run time) 24.0 s 24.5 s
ideal time of all parts 297.5 s 256.5 s
parts, good 139, 136 113, 107
A / P / Q 74.1 / 89.5 / 97.8 % 67.1 / 85.1 / 94.7 %
OEE = A × P × Q 64.8 % 54.1 %
fully productive / planned 64.7 % 54.3 %
  • Every part counted, across the wrap. The MES counted 262 parts, 10 of them bad, in the two shifts and the start of the third; the machine's own count, which does not wrap, said 262 and 10. The total register went 65507 → 13 in shift B.
  • Planned production time is 480 s − 31 s: the 30 s break and, as a planned stop of its own, the half-second or so the line still reports "held" after the MES has released it.
  • Downtime by reason over both shifts: not assigned yet 89.5 s, changeover 80 s, hydraulic pressure low 67 s, motor overload 25.5 s, material missing 21.5 s; 24 minor stops, 49.5 s.
  • A breakdown running into the break (a shorter test shift): booked as downtime up to the break, the break as planned, what was left of the breakdown after it as downtime again. A breakdown that ended straight into a missing pallet: two stops, not one.
  • On the page: Take the material away, then operator away in the "Why?" box → the stop is booked with reason 21, by the operator.
  • The engine: 36.9 s of CPU in 1002 s (3.7 % of one core), 33 MB.

On Linux (WSL, Ubuntu 22.04), the same engine, one shift: A / P / Q 71.2 / 91.5 / 97.1 %, OEE 63.2 %, 137 parts, 133 good; counted 142 and 4 bad against the machine's 142 and 4, across the wrap (65517 → 1). The line's Modbus switched off for 15 s (CN_SLV sta 0x0000, then 0x0303): one stop of 13.5 s booked as reason 99, no signal, and two ERROR lines from the MES's Modbus master as the connection dropped. CTRL-C (SIGINT): exit 0.

Try this

Do See
set product A's ideal_ms in PRODUCTS to 1500 (faster than the machine can go) performance never gets near 100 %; the waterfall calls the gap "running slow" — wrong master data looks exactly like a slow machine
… or to 3000 performance over 100 %: an impossible number is the sign that the standard is wrong
MINOR_S 5 → 2 jams move from performance to availability. The OEE hardly moves; what it is blamed on does
leave stops unassigned for a shift the Pareto's biggest bar may be "not assigned yet" — the data tells you nothing until someone says why
lot size 100 → 30 changeover time grows; availability falls; this is the SMED argument
slide "bad parts" to 10 % quality falls, and so does OEE — by the same factor
stop the line's Modbus (CN_SLV sta 0x0000 in LINE/S00) the MES books what it cannot see as downtime, reason 99 - is that fair to the line? (POLL_LOST_S)
write a query e.g. SELECT reason, sum(dur_s) FROM stop WHERE kind='down' GROUP BY reason in any SQLite tool on log\oee.db

Licence